Planning Application Downloads Area
Contents
Revisions at 5th March 2021
RESPONSE TO SEPA REQUEST FOR ADDITIONAL INFORMATION REGARDING FIREWATER MANAGEMENT – 9345038
ENVIRONMENTAL HEALTH – 9324412
DEE DISTRICT SALMON FISHERY BOARD – 9312694
HISTORIC ENVIRONMENT SCOTLAND – 9309530
SCOTTISH NATURAL HERITAGE – 9286212
Revisions at 15th January 2021
ADDENDUM – AIR QUALITY IMPACT ASSESSMENT – 9297250
AIR QUALITY IMPACT ASSESSMENT – 9284994
AMENDED SITE PLAN APPENDIX A PRIMARY TECHNOLOGY OPTIONS – 9263270
APPENDIX B PRIMARY TECHNOLOGY OPTIONS – 9263271
APPENDIX C SITE SELECTION ASSESSMENT REPORT – 9263272
APPENDIX D DRAINAGE ASSESSMENT – 9263461
APPENDIX D TO ACCOMPANY WRITTEN STATEMENT – 9263274
APPENDIX E PRIMARY TECHNOLOGY OPTIONS – 9263275
APPENDIX F OTTER INFORMATION CONSOLIDATED – 9263276
APPENDIX G ECOLOGICAL – 9263277
APPENDIX H NOISE ASSESSMENT – 9263278
APPENDIX I AIR DISPERSION MODELLING AND AIR QUALITY IMPACT ASSESSMENT – 9263279
APPENDIX J TRANSPORT STATEMENT – 9263280
APPENDIX K THE ROLE OF EMISSIONS IN TECHNOLOGY SELECTION – 9263281
APPENDIX L TO ACCOMPANY WRITTEN STATEMENT – 9263596
CHAPTER 3 AMENDED REV C – 9284997
CHAPTER 4 AMENDED REV C – 9284998
HEAT AND POWER PLAN JANUARY 2021 – 9284999
PLANNING DESIGN AND ACCESS STATEMENT JANUARY 2021 – 9285000
SITE SELECTION REPORT – 9285002
TECHNOLOGY AND EMISSIONS REPORT – 9285003
WASTE CHARACTERISTICS AND COMPOSITE – 9284995
WRITTEN RESPONSE TO SATISFY OUTSTANDING QUERIES REGARDING THE EFW PROPOSAL – 9263441
Appendices
Appendix 3.1 Best Available Technology (BAT)
Appendix 3.2 Waste Characteristics and Composite
Appendix 5.1 Phase 1 Geoenvironmental Report (i)
Appendix 5.1 Phase 1 Geoenvironmental Report (ii) Appendix A
Appendix 5.1 Phase 1 Geoenvironmental Report (iii) Appendix B 1
Appendix 5.1 Phase 1 Geoenvironmental Report (iv) Appendix B 2
Appendix 5.1 Phase 1 Geoenvironmental Report (v) Appendix B 3
Appendix 5.1 Phase 1 Geoenvironmental Report (vi) Appendix B 4
Appendix 5.1 Phase 1 Geoenvironmental Report (vii) Appendix B 5
Appendix 5.1 Phase 1 Geoenvironmental Report (viii) Appendix B 6
Appendix 5.1 Phase 1 Geoenvironmental Report (ix) Appendix B 7
Appendix 5.1 Phase 1 Geoenvironmental Report (x) Appendix C
Appendix 5.2 Flood Risk Assessment
Appendix 5.3 Drainage Assessment
Appendix 6.1 Extended Phase 1 Habitat Survey
Appendix 6.2 Bat Survey and Otter Riverbank Survey
Appendix 7.1 Landscaping Details
Appendix 8.1 Baseline Noise Measurements
Appendix 8.2 Noise Prediction Methodology
Appendix 8.3 Kingspan Product Data Sheet
Appendix 9.1 Dispersion Model Outputs and Construction Dust Impact Assessment
Figures
Figure 4.1 Site plan fencing barriers
Figure 4.2a Site elevation – West
Figure 4.2b Site elevation – East
Figure 4.2c Site elevation – South
Figure 4.2d Site elevation – North
Figure 4.3a Elevation Bldgs 1-3 W
Figure 4.3b Elevation Bldgs 1-3 E
Figure 4.3c Elevation Bldgs 1-3 S
Figure 4.3d Elevation Bldgs 1-3 N
Figure 4.4a Elevation Bldgs 5-12 14 W
Figure 4.4b Elevation Bldgs 5-12 14 E
Figure 4.4c Elevation Bldgs 5-12 14 S
Figure 4.4d Elevation Bldgs 5-12 14 N
Figure 4.5a Elevation Bldgs 13 15 16 W
Figure 4.5b Elevation Bldgs 13 15 16 E
Figure 4.5c Elevation Bldgs 13 15 16 S
Figure 4.5d Elevation Bldgs 13 15 16 N
Figure 4.6a Floor plan buildings 1-3
Figure 4.6b Floor Plan Buildings 5-12 14
Figure 4.6c Floor plan Bldgs 15 16 13
Figure 4.6d Floor plan Bldgs 17
Figure 4.7a Floor Plan Buildings 13 details
Figure 4.7b Floor Plan Buildings 13 details
Figure 4.8a Roof plan Bldgs 1-3
Figure 4.8b Roof Plan Buildings 5-12 14
Figure 4.8c Roof Plan Buildings 15 16 13
Figure 4.10 Flood Extents with Proposed Layout
Figure 4.12a External Lighting Layout 1 of 2
Figure 4.12b External Lighting Layout 2 of 2
Figure 4.13 Floor Plan and Elevations Building 22
Figure 4.16 Elevation – Gabion and Site Fence
Figure 4.17 Elevation Buildings 1-2 South
Figure 4.18 Elevation Building 17 & Tanks
Figure 4.19 Elevation Building 19
Figure 4.20 Elevation Heat Storage Tanks 18
Figure 6.1 Site Boundary and Survey area
Figure 6.2 Phase 1 Survey Results 2019
Figure 6.3 Protected Species Survey Results 2020
Figure 7.1 Landscape and Visual Receptors
Figure 7.2 ZTV at Bennachie SLA (out to 15km)
Figure 7.3 Photomontage Viewpoint 1 Crichie Circle, Port Elphinstone
Figure 7.4 Photomontage Viewpoint 2 Bruce’s Camp, Thainstone
Figure 7.5 Photomontage Viewpoint 3 A96 Road
Figure 7.6 Photomontage Viewpoint 4 Kinkell Church
Figure 7.7 Photomontage Viewpoint 5 Lochburn DriveB987 road junction, Kintore